- The roofing and building of the remaning part of the flood path extending from the area infront of Om Hany and the new road in the small market to Heylaa where it ends with a neck to allow the water to rush up to the ground of Masfala was completed").
- What was next to " El- Salam" door and " Agiaad" door "18 free spaces for watering" was torn down.
- A new space was made in underground southern "Rouak" to replace what was removed.
- A circular path was established on Safa at the same level of the second layer of southern Rouak of Masaah and they were connected by a circular roof (Mokabab). This path was made for those coming from the new Safa door to any of the two floors. - Steel windows were fixed in the western wall of "Masaah" with its two floors.
- The works started with drilling the underground layer and the foundations were installed to extend from the end of southern Rouak till the farewell door.
- The first and second floors were constructed and the walls were covered with marble.
In 1381 Hegrie, the third stage started, including the northern and western areas, as follows:
- It started with demolition of the second section of southern western Rouak.
Foundations were drilled between the farewell door and Omra door. - Installation were constructed and the underground was built as well as the two floors of Rouaks.
-
The preparation started for building the northern Rouak between the El-Omra door and the El- Salam (El-Fata) door.
- The remaining buildings between (El-Omra) door and (El-Basatia) door were torn down.
Underground buildings were finished.
In 1382 Hegrie, he ordered re-operation of the raiment laboratory (raiment factory) under supervision of the Ministry of Hajj & Awkaf, which continues in its development till our days (2)
1- (15-16) the Enlargement of the Two Holy Shrines Civilized Prospection copy 2 year 1413 H. Page 20.
2- Story of the Great Expansion Page 121.