درر الجامع الثمين لاعمال الملوك من ال سعود الميامين في مسجد البلد الامين ملون — الصفحة ١٤٣

The wooden cover of the roof opening was renewed and covered with steel. A surrounding circular steel was made on Ka'aba walls between the two roofs. - One of the three columns in the lower roof was renewed. - The area between the roofs was painted with tar and then painted white. - The Ka'aba wall was roughed from inside and outside. The internal surrounding marble of "Ka'aba's walls" was repaired. The two sides of the door and its higher and lower doorsteps were repaired. The ground of the entrance door was paved with marble, and two half circular iron pieces were installed to facilitate the door's wheel movement. - The steps inside "Ka'aba" reaching to the roof area were repaired. - The three columns were painted with oiled brown color after being cleaned and after the corroded areas were filled with sepedage. - Upon completion the Ka'aba appeared as the most beautiful sight. The following has been taken into consideration. • Only local materials be used. • The surrounding steel belt not exceed the thickness of walls to preserve the orignal thickness of the Ka'aba • The repair expenses be from legal sources. ◊ In 1377 Hegrie, he ordered expansion of the "Mataaf" and its paving with white marble ""). ◇ In 1377 Hegrie, he ordered the removal of the four "Makam" for the sake of expansion. All was removed except for "Makam El-Shafey" which was delayed because it was an old "Zamzam" well (2). ◊ In 1377 Hegrie, the first expansion stage, Building and Foundation, was started (3) 1- The Calender Date to Makkah and the Blessed House of Allah 5/96. 2- The Calender Date to Makkah and the Blessed House of Allah 5/326-330. 3- The Two Holy Shrines Expansion, Civilized Prospection Copy 2 year 1413H. page 20. 35
KTBce_0039622 — ص ٣٥

النص مستخرج آليًّا من صور الكتاب، وقد يقع فيه خطأ.