supply. Tribal organisations and individual land owners are being encouraged through government subsidies and loans to install tube-wells especially since 1960. Constant pumping of subsoil water by the tube-wells sunk in or near the alluvial fans affect the water flow in the karezes. Delay action dams and con- crete pipes are likely to alleviate the karezes from possible water shortages.
This paper discusses the nature of karez irrigation, origin of karez technol- ogy, its circumglobal distribution, its adoption and persistence in Baluchistan province, including the rerent changes in the system.
Nature of Karez Irrigation
karez irrigation utilizes a gently sloping tunnel that brings underground water to the surface, without any water lifting device. The tunnils or adits run from the water bearing alluvial fans at piedmonts to the agricultural valleys. The rain which falls on the highlands or the snow which melts runs quickly off the bedrock of the mountain face and seeps into the unconsolidated material at the piedmont base. In this situation the water table is relatively close to the sur- face.
The first step for a karez developer is to locate the water source at the moun- tain base. This is done with the help of a water diviner, or after putting several trial holes at a potential site. The water diviner uses his magical three-pronged wooden stick to locate the underground water, as is done in many parts of the world. At the chosen site, the karez diggers dig a shaft until they enter the water bearing strata, and then down until they confirm that the rate of seepage is suf- ficient to excavate a karez. The shaft is known as the mother weil
Upon construction of the mother well a system of crude level is used to lay out the line of the karez, between the mother well and the irrigable land. The experience and the expertise of the karez diggers guide them in maintaining the direction and gradient of the tunnels. With only an eye for the lay of the land the persistent use of crude picks and shovels the diggers lay out the system with near perfection. Only the dry river beds on the surface are avoided in tunnel lay-out to eliminate the possibility of a roof collapse. The digging of vertical shafts normally precedes the construction of tunnel. Distances between the vertical shafts depend. on the depth of the water stratum and economics of the karez. After digging the vertical shafts, a tunnel is dug from the lower end to the mother well, above the water bearing stratum, to avoid any interference from the ground water. The size of the tunnel is kept to the smallest possible dimen- sions. Normally a karez has a cross section of 1 meter (3 feet) in height, and
- 40 -
ص ٤٠