c) Jizan Wadi terminal is near the port of Jizan on the Red Sea. d) The gentle gradient of water in Jizan Wadi and the fertility of its soil.
Preliminary study carried by U.N. F.A.O started in 1953/1954. It has been found that the total discharge in 1954 was about 185,000,000 cubic meters of water, and nearly about 90% of this total occurs in July - August. Later on, Saudi Arabian Government handed the project to Ital-Consult Company which lead the study of the project in 1961 and continued to 1965. In fact Ital-Consult Company followed the same pattern of the American Experts as regards water control and economic development suitable to the area & its inhabitants.
The execution of the project was handed to a german company, Hochtief. The dam was built in 1971 having 2 spillways and a reservoir capacity of 2507,000,000 cubic feet (about 19,000,000 gallons.) It has been estimated that 1,800,000,000 cubic feet (13,5 million gallons) is necessary for the irrigation of 3000 acres.
In fact the economic development based upon agriculture made complete use of water stored in reservoir of Jizan Dam besides an additional amount of water coming from wells and undeground aquifers.
SELECTED REFERANCES
1 - Abu-El - Ela (Mohamed): Asir Cairo, 1976. Aramco Handbook, Netherlands, 1960.
2.
3- Aramco World Magazine, Beirut, 1974.
4 - Atlas of Arab World & Middle East, Amesterdam 1960.
5 - Burningham C. W.: Land Water Resources In Saudi Arabia, F. A. O. Report No -0,1952.
6 Davis, E.S.: Abha Dam (Report to the Ministry of Agriculture, 1960). 7- Drouhin, George: Future Prospects for Hydro-agricultural Develop- ment, F. A. O, 1963.
8- Fisher, W. B.: The Middle East, London, 1956.
9- Philby, John: Saudi Arabia, London, 1955
10- Meriam & Remington : Reconnaissance Report of Abha Irrigation Pro- ject, 1957.
11- Simanaky, N. : Preliminary Project for land & Water Use Development in Wadi Jizan, F.A.O Report, 1955.