ملخصات البحوث المدعمة المنتهية العلوم الهندسية — الصفحة ٣٢١

Integrated Framework for The Industrialization-Manpower Sensitivi- ty Analysis in Saudi Development (ARP-5-168).. Unified Load Forecasting for The Kingdom of Saudi Arabia for The Period 1405-1420H. (1985-2000G.) (ARP-6-17). Management of Water Stored Behind Recharge Dams in Central Sau- di Arabia (ARP-6-18). A System for Automatic Recognition of Arabic Characters (ARP-6-20). Electromagnetic Interference from Power Lines in Central Region of Saudi Arabia (ARP-6-38). Investigation of The Future Expansion of The Saudi Telecommunica- tion Network (ARP-6-55). Investigation of A Very Long Heat Pipe (ARP-6-67). On Stream Pipe Corrosion Monitoring Device (ARP-6-70). 61 62 63 64 65 858 66 67 68 Water Resources Potential, Allocation and Reuse in The Western Re- gion (ARP-6-75). 69 Development and Performance Evaluation of Masonry in Western Saudi Arabia (ARP-6-77). 70 Appropriate Location Models for Emergency Sevice Facilities in Saudi Arabia (ARP-6-111).. 71 Kinetics of Methyl Tertiary Butyl Ether Synthesis and Procoss Eco- nomics (ARP- 6 -133). 72 Alternative Strategies in Water Resources Development (ARP-6-134). 73 New Cement Specifications for Durable Concretes in Saudi Arabai (ARP-6-138).- 74 Development of New Building Materials Using Date Palm Fronds (ARP-6-141). 75 Investigation for Irrigation Methods with Waste Water and Drainage Water Reuse (ARP-6-145). 76 Demethanization of Natural Gas by Pressure Swing Adsorption (ARP-6-147). 77 Surfactant/Polymer Flooding of Saudi Lime Stone Oil Reservoirs (ARP-6-161). 79 New Catalyst for Steam Reforming of Natural Gas (ARP-7-19). Corrosion and Corrosion Protection in Desalination Plants (ARP-7-22). - 80 Evaluation of The Protection Capability of The Saudi Sand and As- phalt Against Fast Neuturons and Gamma (ARP-7-64). VIII 81 82880 78
الجزء 2 — ص ١٥٧

النص مستخرج آليًّا من صور الكتاب، وقد يقع فيه خطأ.