نموذج حسابي للتشغيل والتصميم تحليل الحركة الحرجة :
Critical Movement Analysis: OPERATIONS AND DESIGN Calculation Form
مثال Example
(Recalculation)
Intersection
التقاطع
الساعة التصميمي
بيان المشكلة Problem Statement
Step 1. Identify Lane Geometry|||Step 5. Develop Passenger Car
LINCOLN
Volumes (PCV) in pch
Approach 3
N
**
Approach 3
AT =
71 TH= 881
LT.
3.6m 3.6m
COMMERCE
Approach 4
Step 2. Identify Hourly Volumes
Approach 1
LT » 30
TH=20
T= 2
LB. 6
(HV) in vph Approach 3 | AT..
250
Ts
LB.
50
5%
60
LT= TH=_1510
50
T= 594
LB=
AT E
Bo
Approach 4
LT=
TH=
SI 1564
AT =
82
to
TH = 840
LT= 40
T= 2%
B
Step 3. Identify Phasing
AIBZ OL A281
A384 0 M4D3
021-47
Approach 4
LT 126
Design Hour
Step 8.
Adjusted Volumes
Step 9a. Calculate Lane
Volumes
41
Moe-
Intal PCV
Adjusted No. PCV
PCV
of
per
ment (Step 7) U_W_{U«W=PCV)
Lanes Lane
B2
240 1.00 1.10
264
264
53%
21
Approach
BI
264 100 1.10
290
290
AI
1936 1.05 1.00
2033
2 1016
A2
1023 1.05 1.00
1074
2
537
B4
236 1.001.00
236
1
236
D3
316 1.001.00
316
316
A3
454 1.05 1.10
$24
2 262
A4
703 1.05 1.10
812
2 406
Step 6. Calculate Period Volumes||Step 9b. Volume Adjustment for
Approach 2
Approach 1
(PV) in pch
TH: 355
LT. 115
PHF = 0.55
A1-A3
A2-A4
8183
82 84
Step 4. Left Turn Check
Approach
■. Number of
Approach Movement Turn
change intervals
45 45 45 45
per hour
b. Left turn capacity
on change interval.)
90
in vph
c. G/C
Ratio
.50
d. Opposing volume
in vph
910
90 .50 .50 .50 1590 530 330
90 90
e. Left turn
capacity on
green, in vph
C. Left turn capacity in vph (be)
8. Left turn volume
in vph
his volume capac ity (>
&
50
No
Approach 3, PHF 0.93
AT.
76
Probable Phase
TH: 947
LT=
44
LT. 158 TH: 670
PHF = 0.80
AT - 26
Approach 2
Multiphase Signal Overlap
Possible Volume Adjusted Critical Carryover
Volume in pch
20
Critical
lo next phase
Volume
in pch
૪૮ ૪૦ ૪
to 270
90 160 360
1 R
LT=
60
TH: 1940
AT = 26 Approach T
Step 7. Turn Adjustments
Turn volume (PV from Step 61
Opposing vol. in ph from Step 2 Ped. vol hour PCE LT from Table 3 LT sai in pch PCE AT from Table 4 AT vol. in pch
TH vol. in pch from Step &
1
2
3
4
Step 10. Sum of Critical (82 OR BI 1016 (41) 406 (44).
(BF OR BB OR AS GRAN)
1422 pch
B2 AI BI A2 B4 A3 83 4 Step 11. Intersection Level of
LT RT LT AT LT RT LT RT
60 26 44 76 119 79 150 26.
910- 1590 530 330- -600
6.0-
40 · 240 264
- 1.00
-
Service tcompare Step 10 with Table 6)
250-Step 12. Recalculate
2.0 - 20. 236-316-
1.00 1.25 1.25
76-99. 35
· 1940-247- 365 670
90
120
Tout PCV in pch $40
No No
1936
NOT NECESSARY Geometric Change
Signal Change
Volume Change
Comments
D
264
236 516 1023 454 703
المصدر : المرجع رقم (۲۲)
ه تحليل إعادة حساب الحركة الحرجة شكل .
ص ٧٧