تحليل الحركة الحرجة : نموذج حسابي للتشغيل والتصميم
Critical Movement Analysis: OPERATIONS AND DESIGN
مثال
التقاطع
Example Intersection
Calculation Form
LINCOLN AND
COMMERCE
المشكله" تحديد
الساعة التصميمية
Design Hour 4:30-5:30p.m.
Problem Statement FIND EXISTING LOS CAN LT BE HANDLED WITH 26?
Step 1. Identify Lane Geometry||Step 5. Develop Passenger Car
LINCOLN
2.91 3.6m
3.6m
COMMERCE
Approach 3
3.6m 3.6m 2.9m
Approach 2
Approach
Step 8.
Adjusted Volumes
Fotal PCV
Adjusted PCV
Step 9a. Calculate
Lane Volumes
No. PCV
of per
ment (Step 71 U W IU W-PCV) Lanes Lane 240 1.00 1.10 264 1 264
Volumes (PCV) in pch
Approach 3
RT =
71 TH= 081 LT41
Mine
B2
B1
264 100 1.10
290
290
Al
1936 1.05 1.00
2033
2 1016
A2
1023 1.05 1.00
1074
2 537
A3B4
692 1.05 110
799 2 400
AAB3 1019 1.05 110
1177 2 580
Approach
Step 2. Identify Hourly Volumes
@TH= 270
Approach 1 RT
06=1720
T-2%
LB: 6
LT= TH = 1564
51
RT =
82
Approach 4
RT =
70
5%
TH= 940
LT=
40
(HV) in vph Approach 3
150
T
LB-
50
60
T. 2%
LB=
Approach 2
Step 6. Calculate Period Volumes Step 9b. Volume Adjustment for
(PV) in pch
LT = 119
Approach 3
PHF 0.93 76
RT = TH= 947
LT=
44
Probable Phase
Multiphase Signal Overlap
Possible
Critical
Volume
in pch
Volume Carryover 10 next
nhac
Adjusted
Critical Volume
in pch
LT=/20
TH. 510
RT. 20
Approach 1
TH. 395
24
LT
50
T= 5%
TH= 1510 RT= Во
LB
Approach 4
LT.158
TH= 670
26
Approach 2
| Step 3. Identify Phasing 20
A132 OL
A2B1
A3 B4 Oc AAB3
A1-A3
A2+ A4 +
8183 8284
PHF 0.95
LT=
60
TH=1840
RT = 96
Approach
0.80
Step 7. Turn Adjustments
Step 4. Left Turn Check
a. Number of
Approach
Approach Movement
2 3
4
Turn
45
دو
90
change intervals
per hour
b. Left turn capacity
on change interval.
in vph
e. G/C
Ratio
4. Opposing volume
in vph
e. Left turn
capacity on
green, in vph
f. Left turn capacity in vph (b+c)
. Left turn volume
in vph
h. Is volume > capne-
ity (g>()?
.50
910
2 8 0 2 2 2
१०
45 45 45
90 90 .50 .50 .50
1590 530 330
70 270
0 160 60
40 30 120
مله
No No
Turn volume (PV from Step 6) Opposing vol. in vph from Step 2 Ped, vol hour PCE LT from Table 3 LT vol. in peh PCE RT from
Table 4
AT vol. in pch
TH vol. in peh
L
2 3 4
Step 10. Sum of Critical Volumes
(BZ OR BI ORAI DLAZIT (A384 O A483) 1016 (AD). SeBLM83).
1604
*
pch
62 AI BI A2 84 A3 B8 A4 Step 11. Intersection Level of
Service
(compare Step 10 with Table 6)
|_ E*
LT LT LT KT LT AT LT KT
60 6 44 76 119 79 158 26
1910 · 1590 · 530 - 350- 6 - Co • 250. 40 - 60 2.0 2.0- 240 264 138 516.
500 Step 12. Recalculate
ADD ILT LANE TO Geometric Change Alf SOACHES > AND 4. Signal Change
1.1
1.25 1.25
Volume Change
- %
*- n. 33
Comments
from Step & -1840-947-955 670 BORDERLINE DETWEEN LOS D AND E Total PCV in pch 240 264
1934
454 1023
нь 705
شكل ٣ - ٤ نموذج تحليل / حساب الحركة الحرجة
المصدر: المرجع رقم (۲۲)
VY
ص ٧٢