464
5.
Mohammad I. Al-Jarallah
tion.
should remain responsible for the treatment and correc- What ever goes over that limit would be borne by the owner. This procedure has two advantages: First, it eliminates the source of disputes, and second it removes some of the risk and uncertainty for which the contractor must allocate a sizeable mark-up.
the meantime, the owner's right is protected.
In
All probing and cavity filling operations should be under the continuous direction of a qualified engineer or geologist.
REFERENCES
[1]
[2]
[3]
Bramkamp, R.A. and Ramirez, L.F. "Geology of the Northern Tuwayq Quadrangle, Kingdom of Saudi Arabia," U.S. Geological Survey, Miscellaneous Geological Investigation Map I-207 A., 1958.
Powers, R.W. and others, "Geology of the Arabian Peninsula, Sedimentary Geology of Saudi Arabia, "U.S. Geological Survey, Professional Paper 560-D, 1966, 147 P.
U.S. Geological Survey, "Geologic Map of the Arabian Peninsula," U.S. Geological Survey, Miscellaneous Geological Investigations Map I-270 A., 1963.
الكتاب — ص ٤٦٣