السجل العلمي لندوة المشاكل الجيوتكنيكية في المملكة 01-02 — الصفحة ٣٩١

374 J.H. Redding and J.A. Lord prevent the development of sand streamers behind boulders and mounds of soil. By adopting a 1 on 6 slope the need for safety barriers has been avoided. However, with high embankments such shallow slopes would be uneconomic and so a graded profile will be used. Substantially This is also illustrated in Figure 5. more sand is likely to collect at the windward toe of such embankments and this will have the effect of reducing the angle of the lower part of the slope to produce a more stream- lined profile. The sand will remain in this position, however, trapped in the zone of low velocity turbulence. Cutting slopes In sandy areas where, for economic reasons cuttings could not be avoided, the following design methods have been adopted: In soil In soil and particularly loose sand, a shallow profile with side slopes no steeper than 1 to 10 (6°) has been used. Such a gradient is considered to be the steepest compatible with continued sand transport and the shallowest economic slope. Additionally a 5m wide ditch will be left at the foot of the slope and the carriageway raised on a 0.5 m high embankment with 1 to 6 side slopes (Figure 6). There will be a tendency for some sand to be deposited on the cut slope as a result of wind deceleration, but this will be counteracted by treating the surface to increase its resilience and to prevent erosion (see "Surface stabilization"). The provision of the ditch will enable deposited sand to collect safely and if necessary to be periodically removed.
الكتاب — ص ٣٧٣

النص مستخرج آليًّا من صور الكتاب، وقد يقع فيه خطأ.