Problems of Deep Basement Construction in Riyadh
149
The excavation showed that the surface of the limestone was undulating. The greatest depth to rockhead, between 8.5m and 10m, was along the southern boundary of the site (see Plate 5). This would appear to be a tributary to the main wadi along Airport Street in which the wadi sand and gravel are between 12m and 16m thick. However, at a site in the centre of Riyadh (Hillat Al Hamad site in Figure 1 which is also in the centre of the wadi), brecciated limestone was found at ground level beneath part of the site, but dipping steeply to a depth of 16m in a distance of only 35m. apparent therefore that rock can outcrop even within the principal wadi in Riyadh.
It is
During the anchoring, difficulties were experienced in certain areas with strong upward flows of water, washing away the grout surrounding the anchors. These areas were found to coincide with the locations of the original series of boreholes as a result of not grouting these boreholes upon completion the low permeability layer beneath excavation level had been punctured. In these instances, a packer was inserted into the hole which was then grouted under pressure with a sand-cement grout. After the grout had set the hole was redrilled and the anchor was installed in the normal way.
CONCLUDING REMARKS
1.
This paper has shown that by undertaking a detailed site investigation it was possible to effect considerable savings in the construction of a deep basement in
Riyadh. In particular, it has been found that
the wadi sands and gravels are weakly cemented, probably with carbonates