Figure 6 shows the grout takes at each of the probe holes. Because of the additional excavation carried out by the Main Contractor prior to the grouting, the takes were not as high as had been expected, as it was evident that the excavation had been taken below two of the horizons containing significant cavities. For the majority of holes the grout take was less than 300 litres. However, there were zones where significant grout takes were obtained, especially in the centre of the site. In one area, the water flow was too great to allow grouting at a depth of 2 metres below basement level. The location of these holes coincided with one ofthe heaviest column loads and it was therefore necessary to excavate down to this level and backfill with mass concrete. In carrying out this excavation it was evident that the grout- ing operations had significantly reduced the flow of the water into the site, by permitting such a depth of excavation to be carried out successfully with limited pumping.
CONCLUSIONS
The paper has shown the benefits of carrying out a thorough geological desk study and comprehensive site investi- gation even when the structure is founded on a strong lime- stone bedrock. In conditions where strata have slumped on account of the solution of gypsum and anhydrite in underlying strata, cavities and voids in the limestone may be expected and careful drilling and coring is required to locate such voids. In addition it is recommended that permeability test- ing is carried out to check ont he possibility of cavities occurring.
If cavities are located the engineer must decide on whether grouting of the voids is required on the basis of risk
الكتاب — ص ١١٨